Home & ConstructionCanada versionFormula-based · Runs in your browser

Electrical Panel Load Screening Calculator — Canada

Check a specified single-phase demand scenario without applying an invented code demand schedule. CAD planning view; stated limitations apply.

Preparing saved example…

Inputs

Enter the values you know. Optional fields may be left empty.

Local save controls below
Required
Required
%
Required
%
Required
Required
Required
Required
Required
CAD
Required
CAD
Required
CAD
Required
CAD
Required
Required
%
Required
%

Result

Updates as valid inputs change.

Calculated locally
Illustrative defaults are not local quotes or verified legal rules. Dated reference components and user-entered assumptions are explicitly distinguished. Professional review is pending.
Middle cost scenario
—
Adjusted scenario load, W
—
Scenario current, A
—
Arithmetic rating minus scenario current, A
—
Material cost
—
Labor allowance
—
Delivery allowance
—
Other specified costs
—
Entered tax allowance
—
Low cost scenario
—
High cost scenario
—

Saved locally, explained clearly

Drafts, calculations, scenarios, and workflow progress stay in this browser unless you export them.

Opening local database…

Calculation steps

Follow what happened from the selected formula to the displayed answer.

Show substituted values and intermediate working
Calculate current inputs to see the working.
  1. 1

    Formula selected

    The calculator uses the following formula or method.

    scenario current = connected watts × demand factor × (1 + continuous share × (multiplier − 1)) ÷ (voltage × power factor).

    Inputs are converted to canonical units before evaluating this stated formula.

  2. 2

    Values entered

    Your values are placed into the calculation.

    Enter values to see what is used in this step.

  3. 3

    Result calculated

    The formula or method produces the following result values.

    Results will appear after a successful calculation.

  4. 4

    Answer formatted

    Displayed values are rounded and formatted using each output’s configured precision.

Scenario comparison

Save working scenarios, then select two or three to compare. Formula versions and inputs remain visible.

No scenarios saved for this calculator yet.

Recent calculations

Successful calculations are retained locally according to your privacy settings.

No local history for this calculator yet.

Data and privacy

How it works

Check a specified single-phase demand scenario without applying an invented code demand schedule.

This is the Canada planning view, with monetary inputs and outputs in CAD. A currency label does not establish that a tax rate, construction price, coverage rule or legal limit has been verified locally. The inputs and limitations below describe the actual scope.

Input query strings and outputs

Use an input name in this page’s URL as ?name=value, and join additional inputs with &. Portable shared links may instead use the compact ?ac= state parameter.

Input query strings

14
  • ?connectedWatts= Total connected load, W

    Number · Required · Default: 18,000

  • ?demandFactor= Explicit engineered demand factor

    Percentage · Required · Default: 75

  • ?continuousShare= Continuous share of demand load

    Percentage · Required · Default: 25

  • ?continuousMultiplier= Specified continuous-load multiplier

    Number · Required · Default: 1.25

  • ?voltage= Single-phase line-to-line supply, V

    Number · Required · Default: 240

  • ?powerFactor= Power factor

    Number · Required · Default: 1

  • ?panelRating= Entered panel current rating, A

    Number · Required · Default: 100

  • ?unitRate= Material price per quoted panel project

    Money · Required · Default: 0

  • ?laborCost= Total labor allowance

    Money · Required · Default: 0

  • ?deliveryCost= Delivery allowance

    Money · Required · Default: 0

  • ?otherCost= Other fixed costs

    Money · Required · Default: 0

  • ?costMultiplier= Material/labor multiplier

    Number · Required · Default: 1

  • ?spreadPercent= Low/high sensitivity around the entered total

    Percentage · Required · Default: 15

  • ?taxRate= Explicit tax allowance

    Percentage · Required · Default: 0

Outputs

11
  • designWatts Adjusted scenario load, W

    Number

  • current Scenario current, A

    Number

  • headroom Arithmetic rating minus scenario current, A

    Number

  • materialCost Material cost

    Currency · Currency: CAD

  • laborCost Labor allowance

    Currency · Currency: CAD

  • deliveryCost Delivery allowance

    Currency · Currency: CAD

  • otherCost Other specified costs

    Currency · Currency: CAD

  • tax Entered tax allowance

    Currency · Currency: CAD

  • low Low cost scenario

    Currency · Currency: CAD

  • mid Middle cost scenario

    Currency · Primary output · Currency: CAD

  • high High cost scenario

    Currency · Currency: CAD

Formula

scenario current = connected watts × demand factor × (1 + continuous share × (multiplier − 1)) ÷ (voltage × power factor).

Calculations retain numeric precision internally. Displayed values are rounded for readability. Quantities that must be purchased as whole units are rounded up only where the formula explicitly requires it.

Read the inputs before calculating

  • Total connected load, W: Enter the quantity described by the label.
  • Explicit engineered demand factor: Enter the quantity described by the label.
  • Continuous share of demand load: Enter the quantity described by the label.
  • Specified continuous-load multiplier: Enter the quantity described by the label.
  • Single-phase line-to-line supply, V: Enter the quantity described by the label.
  • Power factor: Enter the quantity described by the label.
  • Entered panel current rating, A: Enter the quantity described by the label.
  • Material price per quoted panel project: Zero means unpriced, not free. Enter a current, scoped supplier quote.
  • Total labor allowance: Enter the quantity described by the label.
  • Delivery allowance: Enter the quantity described by the label.
  • Other fixed costs: Enter the quantity described by the label.
  • Material/labor multiplier: Use a verified regional index only when supplied. 1 is an unadjusted scenario, not a researched index.
  • Low/high sensitivity around the entered total: Enter the quantity described by the label.
  • Explicit tax allowance: Enter the quantity described by the label.

Reproducible worked example

The following is a fictional arithmetic example, not a local quote, a verified claimant or a market forecast. Its values are included so the formula can be checked. The form does not automatically confirm any verification checkbox.

InputExample value
Total connected load, W18,000
Explicit engineered demand factor75
Continuous share of demand load25
Specified continuous-load multiplier1.25
Single-phase line-to-line supply, V240
Power factor1
Entered panel current rating, A100
Material price per quoted panel project0
Total labor allowance0
Delivery allowance0
Other fixed costs0
Material/labor multiplier1
Low/high sensitivity around the entered total15
Explicit tax allowance0
OutputCalculated result
Adjusted scenario load, W14,343.75
Scenario current, A59.7656
Arithmetic rating minus scenario current, A40.2344
Material costCAD 0
Labor allowanceCAD 0
Delivery allowanceCAD 0
Other specified costsCAD 0
Entered tax allowanceCAD 0
Low cost scenarioCAD 0
Middle cost scenarioCAD 0
High cost scenarioCAD 0

Interpreting a changed assumption

Start with one complete scenario and change only one input when diagnosing a difference. Recheck units, the period of every rate, whether an amount is recurring or one-off, and whether a cost is already included elsewhere. A larger calculated benefit is not evidence that an assumption is more likely to occur.

Limitations

  • Quantities and user-entered costs are planning estimates. Drawings, manufacturer instructions, local permits and qualified site-specific design take precedence.
  • Material is unpriced. A zero material price is not evidence that the material is free.
  • Prices and the tax allowance are user-entered planning assumptions, not a verified local quote. Low/high outputs are sensitivity scenarios, not market confidence limits.
  • The multiplier applies only to material and labor; delivery and fixed costs are not multiplied.
  • Not an NEC Article 220 or CEC Section 8 service calculation. Positive arithmetic headroom does not establish safe capacity, phase balance, conductor size, utility capacity or permission to add a circuit.

Frequently asked questions

What does this Electrical Panel Load Screening result represent?

Check a specified single-phase demand scenario without applying an invented code demand schedule. It applies the displayed formula to your inputs; it does not infer omitted facts.

No. Numeric defaults are illustrative unless an input or dated reference explicitly identifies a researched component. Currency is CAD; local quotes, eligibility and unsupported rules must be entered and verified separately.

What must I check before relying on the result?

Quantities and user-entered costs are planning estimates. Drawings, manufacturer instructions, local permits and qualified site-specific design take precedence.

Can I compare or share different assumptions?

Change one assumption at a time and use the browser-local project or share controls. A shared URL contains the encoded input values; do not include information you do not wish to disclose.

Sources and reference scope

  • NIST unit conversion guidance — retrieved 2026-09-24. Unit definitions; geometry and financial arithmetic in these worksheets are explicitly stated.
  • DOE insulation overview — retrieved 2026-09-24. Insulation and thermal resistance concepts; not structural or code approval.

These references support only their stated scope. They are not evidence that every local rule or price needed by the master expansion has been loaded.

Sources
Limitations
  • Illustrative defaults are not local quotes or verified legal rules. Dated reference components and user-entered assumptions are explicitly distinguished. Professional review is pending.
  • Inputs are converted to canonical units before evaluating this stated formula.
  • Material quantities are estimates. Confirm site dimensions, product coverage, waste, and local requirements before ordering or construction.
A LITTLE MORE LOCAL

Where are you calculating?

Choose your country for local calculator versions. You can change it anytime in the navigation bar.

Choose a country